Subcontract package strategy
Subcontractor management begins by deciding what should be subcontracted and how the scope should be packaged. Technical boundaries, geography, construction sequence, local-content rules, specialist capability, temporary works, access and interface risk are considered before RFQs are issued.
Poor packaging can leave responsibility gaps with the main contractor or create excessive interfaces that no subcontractor has priced. Gokbilge tests package boundaries and identifies retained risks before the market is approached.