Commissioning strategy and system boundaries
Commissioning begins by defining systems, subsystems, boundaries, prerequisites and acceptance criteria before energisation or start-up. The completion sequence is aligned with construction priorities and operational needs rather than left until the end of the project.
Procedures identify required drawings, settings, vendor attendance, utilities, temporary supplies, permits, test equipment and safety conditions for each test stage.