Quality planning before work starts
Quality control is most effective when acceptance evidence is designed before fabrication or installation begins. Gokbilge converts contract requirements, specifications, drawings, codes, approved submittals and manufacturer instructions into a Project Quality Plan, discipline-specific inspection and test plans and traceable inspection registers.
Hold points, witness points, review points, responsible parties and required records are defined before the work reaches an irreversible stage. This reduces the risk of discovering after concealment, shipment or energization that the evidence required for acceptance was never produced.