International EPC delivery conditions
The Mirwais Bridge project in Kabul combined structural design and construction under EPC responsibility. The completed prestressed-concrete bridge is 500 metres long and 24 metres wide and was delivered in nine months for Suleyman Sahin Inşaat under international project conditions.
Delivering a bridge in this context required engineering, site supervision and construction sequencing to remain closely connected. Material availability, site logistics, structural quality and local coordination all needed to support the same completion programme rather than being managed as separate administrative streams.