Completed project · 2013-2016

Senkron natural stone processing factory EPC, Afyon

Full EPC delivery of a natural stone processing facility in Afyon, covering process layout, mechanical installation and commissioning.

Aerial view of the completed Senkron natural stone processing facility in Afyon with covered production halls and stone slab storage yard.
Location
Afyon, Türkiye
Period
2013-2016
Gokbilge role
EPC contractor

The Senkron project delivered a natural stone processing facility in Afyon under full EPC responsibility, from process layout and equipment specification through mechanical installation.

Commissioning and acceptance testing brought the processing lines to operational readiness, with documentation structured for ongoing maintenance and capacity expansion.

  • Process layout and equipment specification
  • Mechanical installation of processing lines
  • Commissioning and acceptance testing

Project experience

Delivery context and execution approach

The sections below add technical context to the published project facts without introducing undisclosed commercial or customer claims.

01

From process layout to an operating facility

The Senkron project was delivered under full EPC responsibility for a natural stone processing facility in Afyon. The assignment connected process layout and equipment specification with the physical requirements of the production lines, mechanical installation and the utilities needed to bring the plant into service.

Industrial process facilities require more than placing machines inside a building. Equipment footprints, access, material flow, maintenance space, foundations, utilities and installation sequence must support the intended production process. Coordinating those constraints early reduces field relocation and allows mechanical installation to proceed against a stable layout.

02

Commissioning and maintainable handover

Commissioning and acceptance testing completed the transition from installed processing lines to operational readiness. Mechanical completion, equipment checks and functional performance had to be verified against the intended process before the facility could be handed over for routine production.

Project documentation was structured to support ongoing maintenance and future capacity expansion. That continuity is important in production facilities because later modifications depend on reliable records of equipment arrangement, interfaces and the configuration accepted at handover.

03

EPC accountability across process and facility interfaces

The Senkron reference is useful because Gokbilge's published role covers full EPC delivery rather than a single discipline. Process layout and equipment specification influence foundations, access, utilities, maintenance clearances, material movement and installation sequence; those dependencies have to be resolved before the processing line can operate as one system.

Carrying those decisions through mechanical installation and commissioning gives the project a complete delivery arc from engineering definition to operating readiness. It is therefore a direct reference for the EPC positioning now used across the website.

04

Industrial handover and future plant changes

An industrial facility continues to evolve after initial handover. Reliable records of equipment arrangement, utilities, interfaces and accepted operating condition become the baseline for maintenance, troubleshooting and future capacity modifications.

The project therefore illustrates why EPC handover should include more than physical completion. Commissioning results and controlled documentation preserve the engineering intent for the operating team and reduce uncertainty when later changes are introduced.