Project · 2016-2017

Karaman-Ulukisla high-speed railway construction, Suleoglu-Ayranci section

Construction of a 46 km high-speed rail line (design speed >250 km/h) on the Suleoglu-Ayranci section, including 1.2 km of NATM tunnel, three viaducts and bridges, four underpasses and five overpasses.

Karaman-Ulukisla high-speed railway construction, Suleoglu-Ayranci section — representative photograph

The Karaman-Ulukisla line is part of a wider approximately 135 km double-track high-speed rail corridor designed for speeds above 250 km/h. Gokbilge's scope on the Suleoglu-Ayranci section covered 23 km of double-track railway infrastructure and superstructure, including 1.2 km of tunnel works executed using the New Austrian Tunnelling Method (NATM).

The first line has been completed and is awaiting test clearance before traffic is diverted from the existing line, at which point disassembly and excavation begin on the second line. A geological fault fracture encountered during later tunnel segments introduced a schedule delay on the phase 2 works, which is being managed through revised sequencing and technical mitigation.

  • 46 km high-speed rail alignment, first line completed
  • 1.2 km NATM tunnel, three viaducts, nine grade-separated crossings
  • Track testing coordination ahead of traffic diversion to the new line